As you can see, work is continuing on the UD Almería stadium. The plan is to wrap the stadium with a red panel facade. The fixings for the facade are being installed now.
The article here on the La Voz de Almería website has more details.
Read More for a Google translation of the article.
Come and see, every day there is something new
Every morning there is something new at the Estadio de los Juegos Mediterráneos, a sports venue that will be wonderful when the works are finished, which have been at a frenetic pace since minute one when the shovel was put in for the first time. Turki promised a stadium for the city and for Almería, and he will keep his word because the Saudi minister is not one of projects, nor of promises... it is reality and the new Mediterranean Games Stadium will be a reality. A tour of the venue, either inside or outside, serves to verify that everything is changing and what will change even more when the final phase of the remodeling is reached.
The pace of work is dizzying and where one day there is nothing, the next week you find a giant screen, either on the main facade of the Mediterranean Games Stadium, where the offices of the Municipal Sports Board (PMD ), or the screen that has been installed on the façade of the 'Puche Fund', which is of spectacular dimensions. The same happens with the screen that was mounted in record time in the Preference stands, or the two video scoreboards of the two funds.
Images are projected on the three screens inside the new Mediterranean Games Stadium: from the arrival of the teams to the field, the match, the fans in the stands... Turki is making those who go to the field begin to feel like you are in a high-class stadium, in a First Class venue, at the same level as the great stadiums of Spanish football. Then there are the boxes, which come out without stopping, as if from under the ground.
Rhythm
Some are over and where football looks great. Others are under construction and where the pace of work does not stop. In two weeks, at most, it seems that those under construction to the left of the Tribune stands will be ready. The works in the store and at the box office have evolved tremendously in recent times with a work rate as if the world were going to end. of vertigo.
If we take a tour of the locker room area, everything is changing with very large spaces to work: First Division locker rooms, gym with the latest technology, games room... in short, a category stadium for an Almería that hopes to achieve the ascent. The press room, when it is finished, will be top, at the level of those that the greats of Spanish and European football have.